Spindlers Hof Berlin underground car park and ramps

Scoprire di più

Key facts: Application of wear-resistant coating

Luogo
Berlin
Completamento
2017
Superficie
2,500 m² underground car park + 160 m² ramps
Esecuzione
Dry Works Sonderbau GmbH, Hoppegarten

Spindlers Hof underground car park and ramps.

As part of an extensive refurbishment project, the underground car park of Spindler Hof in Berlin-Mitte was to be given a wear-resistant coating, among other things. A slip-resistant solution was required for the access ramps that would permanently withstand the high thrust and shear forces needed there and be compatible with the existing ramp heating system. The planners, the local company Aukett + Heese GmbH, decided to use Triflex in order to meet these requirements. The dynamic
crack-bridging parking deck coating system Triflex ProDeck (OS 11b) based on polymethylmethacrylate (PMMA) does not wear out, even with high frequency use. With the special reinforcement Triflex ProMesh the result is an even force distribution, which minimises movements of the substrate and thus the risk of cracking. The intermediate deck coating system Triflex DeckCoat (OS 8) increases the slip resistance in road surfaces and parking areas. The work was carried out by the specialist contractors at Dry Works Sonderbau GmbH, Hoppegarten, who have many years of experience with Triflex system solutions.

Refurbishment requirements

  • Reliable structural protection against moisture and chloride ingress
  • Anti-slip, wear-resistant coating
  • Short closure periods
  • Easy to maintain
  • Integration of details such as rising components, upstands at the kerbs, floor drains

Refurbishment steps overview

  1. Shot blasting surfaces and concrete repair
  2. Priming of surface and details with Triflex Cryl Primer 287
  3. Sealing all details with Triflex ProDetail and Triflex Special Fleece
  4. Laying out the reinforcement Triflex ProMesh on the ramps and impregnating with Triflex Cryl Primer 287
  5. Coating of the surface with Triflex ProDeck (ramps) or with Triflex Cryl Finish 209 (underground car park)
  6. Sprinkling fine hard grain (ramps) or quartz sand (underground car park) into the fresh coating and removal of the excess after setting
  7. Sealing the area as well as coloured marking of the kerbs and pedestrian crossings with Triflex Cryl Finish 209

TRIFLEX PROVED TO BE THE IDEAL SOLUTION FOR THE REQUIREMENTS OF THE VARIOUS AREAS, AS ALL SYSTEMS ARE COMPATIBLE WITH EACH OTHER.

Aukett und Heese GmbH, Berlin

More references

Thumbnail
Triflex ProDetail
Thumbnail
Triflex ProPark
Thumbnail
Triflex ProPark
Thumbnail
Triflex AWS
Thumbnail
Triflex AWS
Thumbnail
Triflex DeckFloor
Thumbnail
Triflex DeckFloor
Thumbnail
Triflex ProDeck