Weimarer Straße Wolfsburg multi-storey car park

Scoprire di più

Key facts: Refurbishment of car park deck

Location
Salzgitter
Completion
2015
Area
1,800 m² top deck and ramp access
Authorised Contractor
Holl Flachdachbau GmbH & Co. KG, Salzgitter

Weimarer Straße multi-storey car park.

Cracked asphalt, a defective bitumen seal and penetrating moisture in the lower deck – this was the damage assessment of a car park on Weimarer Strasse, Wolfsburg. In order to secure the contents and to provide the users with comfortable
parking space close to the apartments, the manager, BUWOG Immobilien Management GmbH, Wolfsburg, arranged for the 1,800 m2 top deck and ramp access to be repaired. A long-lasting seal was required that could also be attractively designed and at the same time had an attractive cost-benefit ratio. This was offered by the liquid applied waterproofing solution from Triflex. After joint, intensive planning by Harm Stelling, Triflex Sales Manager East Germany, the executing company Holl Flachdachbau, Salzgitter, the administration and the owners’ association, the decision was made to use the top deck waterproofing system Triflex ProPark, version II.

Refurbishment requirements

  • Permanent protection against moisture ingress
  • Products approved by the building authorities
  • High wear resistance of the wearing layer
  • Application on old layer without any need for demolition
  • Maximum safety for users
  • Coloured marking

Refurbishment steps overview

  1. Sealing all details with Triflex ProDetail and Triflex Special Fleece
  2. Sealing the surface with Triflex ProPark
  3. Producing the highly abrasion-resistant wearing layer using Triflex Cryl M 264: Roadway in dark traffic grey, parking areas in window grey, white parking space markings and arrows on the entry and exit ramp, white parking space numbering
  4. Dressing with Triflex MicroChips into the waterproofing of the inner walls
  5. Providing the disarmament with aluminium covers

THE DECISION IN FAVOUR OF THE LIQUID APPLIED WATERPROOFING SOLUTION MEANT THAT THE COST WAS ULTIMATELY ONLY AROUND A THIRD OF THE ORIGINAL PRICE.

Heiko Hartig, Holl Flachdachbau GmbH & Co. KG

More references

Thumbnail
Triflex ProDetail
Thumbnail
Triflex ProPark
Thumbnail
Triflex ProPark
Thumbnail
Triflex DeckFloor
Thumbnail
Triflex DeckFloor
Thumbnail
Triflex CPS-F
Thumbnail
Sistemi per parcheggi multipiano Triflex